Change Order Technician at Vertiv

Puesto Change Order Technician
Publicado 26 Mar 2026
Expirado 25 Apr 2026
Empresa Vertiv
Ubicación México | MX
Tipo de Contrato Full Time

Descripción del Puesto:

Última información laboral de Vertiv para la posición de Change Order Technician. If the Change Order Technician vacante en México coincide con tus calificaciones, envía tu solicitud o currículum directamente a través del portal actualizado de Jobkos.

Ten en cuenta que aplicar a un trabajo puede no ser siempre fácil, ya que los candidatos deben cumplir con ciertos requisitos establecidos por la empresa. Esperamos que esta oportunidad en Vertiv para la posición de Change Order Technician se ajuste a tu perfil profesional.

The Change Order Technician is responsible for the administrative and operational flow of project modifications.

Key Responsibilities
  • Post-Design Tracking: Receive completed change documents from Design Engineering and immediately log them into the master tracking system.
  • Approval Acceleration: Monitor the status of pending approvals (internal and wider Vertiv team). Use a \"follow-up and escape\" approach to ensure stakeholders sign off on engineering changes within the required Service Level Agreement (SLA) window.
  • Switchgear Component Monitoring: Maintain specific focus on long-lead switchgear items affected by changes (e.g., breakers, busbars, enclosures) to ensure procurement is notified the moment a change is finalized.
  • Master Spreadsheet Maintenance: Own the accuracy of the change order log. Update status fields daily to reflect where each change sits in the lifecycle (e.g., Submitted, Pending Approval, Closed).
  • Status Reporting: Generate weekly reports for project teams, highlighting any change orders that are stalled in the workflow.
Required Qualifications
  • Experience: 1–3 years in a technical clerical, project coordination, or expediting role. Experience in a manufacturing or electrical construction environment is a major plus.
  • Technical Literacy: Ability to read basic electrical line diagrams and identify switchgear terminology to ensure data entry accuracy.
  • \"Gatekeeper\" Mentality: A disciplined approach to following processes and the confidence to escalate delays to management when tasks are overdue.
  • Software Skills: High proficiency in Microsoft Excel (data entry, filtering, and basic formulas).
  • Organization: Proven ability to manage multiple moving parts simultaneously without losing track of individual task deadlines.
#J-18808-Ljbffr

Información de la Vacante:

  • Empresa: Vertiv
  • Puesto: Change Order Technician
  • Lugar de Trabajo: México
  • País: MX

Cómo Enviar tu Postulación:

Después de leer y comprender los criterios y requisitos mínimos explicados en la información del trabajo Change Order Technician at the office México anterior, completa de inmediato tus archivos de solicitud, como carta de presentación, CV (Hoja de Vida), copia de diploma y otros suplementos. Envía a través del enlace Siguiente Página abajo.

ESTA OFERTA HA EXPIRADO (Hace más de 30 días).
Busca nuevas oportunidades laborales en nuestro Inicio.

Vacantes Similares